Smoke-extraction engineering: CERIB recognized as a Competent Body
On November 14, 2022, CERIB was recognized by the French Ministry of the Interior as competent with respect to smoke-extraction engineering. This recognition is the result of application ...
Travaux magazine: interview with Fire Testing Centre manager, Christophe Tessier
In the report "Tester, calculer et simuler le feu pour mieux prévenir" (Test, Calculate and Simulate Fire for Better Prevention) published in trade press magazine Travaux No. 977, Christophe ...
Partnership between Fire Testing Centre and Eurailtest for global expertise regarding railways, by means of a ‘one-stop shop’ addressing fire reaction and resistance
On 30 June, Gilles Bernardeau, CEO of CERIB, and Franck Poisson, Director of Eurailtest, signed a partnership agreement for providing manufacturers and contractors in the rail industry with ...
Takwa Sayari awarded special Public Works prize sponsored by FNTP
Takwa Sayari awarded special Public Works prize sponsored by FNTP Takwa Sayari, a third-year PhD. student at the Fire Testing Centre and at ENS Paris–Saclay University, was awarded ...
“C’est ici” : a programme about the CERIB and the CEF
“C’est ici" The new programme "C'est ici" on France 3 Centre Val de Loire TV Channel, takes us on a journey to discover the territories of our region ...
CEF at the AFTES 2021 Congress
The teams of the Fire Testing Centre took part in the XVIth International Congress of the AFTES dedicated to the underground, a space for innovation. From September 6 ...
A world first at the CERIB Fire Testing Centre!
As part of his thesis, which is a continuation of previous work carried out, Silvio Renard, doctoral engineer in the R&D team of the Cerib Fire Testing Centre, ...
Results of the Lepir 2 fire test on a hemp concrete wall at CERIB Fire Testing Centre
CERIB's Fire Testing Centre (CEF) conducted a Lepir 2* test on a hemp concrete wall on October 16, 2020, for “Construire en Chanvre” to complete the benchmarks results ...